Got a start on re-installing the carpet. Pictures keep turning out dark - so pictures later.
Got most of the engine compartment wiring done. More to do after the engine is back.
New rack mounted. Passenger side bracket has been sand blasted - will install after paint has dried.
Lucked out on the rubber being in mint shape.
Note the 90 degree fittings on the heater hoses. Wanted a "clean" install, and ran them down the inner fenders.
Nice blue silicone hoses !
All bolts, nuts, washers, screws etc have been replaced with new.
All hose clamps have been replaced with banded clamps.