The pics below represent the progress I have made to date. I installed the fuel pump, fuel pump bracket, thermostat, motor mounts, intake, carb, distributor, power steering pump, alternator, belts. I degreased and wire brushed/wheeled the exhaust hangers, rear tie downs, tranny mounts, accelerator linkage and the line from the fuel pump to carb. I sprayed them all with rust convertor. I will spray them all black over this week, although it is supposed to be cold so I may wait until next weekend. The header, air cleaner and valve cover are just on temporarily. The header will come off before putting the engine back in the chassis. I will bolt the stock exhaust manifold and lifting ring back on for the installation. Next weekend I will change the tranny filter, then bolt the engine and tranny back together in preparation for reinstalling the assembly back in the chassis. If I have time I will assemble the front suspension, brakes, and steering. If I run out of time, I will just roll it into the corner until April/May. I have an issue with one of the motor mounts and will post my question/concerns on the "Ask the Experts" forum. Moving right along...