Current Classifieds

Holley 2305 progressive 2 bbl carb 350cfm

Date: 10/11/2019 11:13 am
WTB: Factory air cleaner and fan shroud 1971 2.0
Date: 02/05/2020 11:06 am
nos core support

Date: 01/03/2020 09:39 pm
Rear Bumper
Date: 07/26/2021 01:08 pm
V8 rear end
Date: 04/12/2018 10:57 am
Clutch Pedals for 75to 80 Pinto
Date: 09/21/2018 11:35 am
FLOOR PANS
Date: 06/12/2020 07:24 pm
Pinto drive train

Date: 06/29/2018 08:32 am
Steering Wheel Needed for 1972 Pinto
Date: 08/08/2018 12:26 pm
74 Pinto Hub Caps & Trim Rings

Date: 02/18/2017 04:47 pm
78 pinto wagon

Date: 03/03/2020 01:07 pm
2.8 radiator
Date: 10/25/2019 04:10 pm

Author Topic: 2.3 mods part 2  (Read 880 times)

0 Members and 1 Guest are viewing this topic.

Offline slowride

  • Pinto Sr. Member
  • ****
  • Posts: 279
  • FeedBack: +18/-0

  • Total Badges: 3
    Badges: (View All)
    Topic Starter Windows User Fifth year Anniversary
2.3 mods part 2
« on: April 28, 2014, 08:33:42 PM »
The mods continue. The biggest issue I found with using a Weber 38 is it use the inboard throttle shaft whereas the 32/36 uses the outboard  (primary). That means the rotation is opposite, so rather than dick around with a bellcrank (which only complicates a kickdown), I decided to make the outboard shaft work off the cable.
I had a spare 32/36 which supplied the bracket for the throttle shaft. All I had to do (so far) is grind the staking off the old shaft, drill it to use the little hub on the new "gear" as a center, drill and tap the new shaft to hold the bracket on, and clearance the ear on the throttle spring. I have one more fastener to design to ensure the gear is secured on both sides, but that shouldn't be a big deal. (old 38 bracket on the right is coming off)
I should be able to use the stock cable bracket, cable, and kickdown once it's assembled.