Finally go some assembly going. Put the vent back in along with a good wiper motor.
Also got the column support & automatic pedal installed. It's all shiny black POR & pretty.
The new master cylinder is in & hooked to the pedal. I need an adapter for the brake line but that's easy stuff.
The new rack is in & everything's painted.
Also got the front latch support bolted in. I'm ready for the sheetmetal & some primer but I think I'll get the engine gaskets done & drop it in first. It will be easier with no fenders in my way.
This is now a race to finish before the snow flies. God help me....